Urchany Water Tank, Nairn
Murform carried out the formwork, steel fixing and concrete placement for the 45-metre-long, 27-metre-wide reinforced concrete water tank at Urchany […]
Read more »Murform carried out the formwork, steel fixing and concrete placement for the 45-metre-long, 27-metre-wide reinforced concrete water tank at Urchany […]
Read more »Construction began at the 103-turbine Viking Wind farm in August 2020 with road works and other site preparation works being […]
Read more »Brent Hall is a private residence in Great Warley Essex, the existing house at the site has been thoughtfully extended […]
Read more »Construction began in late 2017 at this new build student accommodation development in Stoke on Trent. SCI Contracts contracted Murform […]
Read more »The Earth Sheltered House in Milton Keynes is an interesting and unique private family home. The house near Bletchley essentially […]
Read more »The concrete and CLT package delivered by Murform and G-frame Structures incorporates piling, groundworks, drainage and construction of the reinforced […]
Read more »Sandford Hydro was our first project working with Fergal Contracting Co Ltd. The project saw the restoration of the Lasher […]
Read more »Our concrete works formed part of the transformation of the former coal-fired Lostock power station in Northwich, Cheshire into an […]
Read more »Set against the scenic backdrop of the Wentworth Golf Course in the South of England, Romany House is a large […]
Read more »The project involved the construction of a new underbridge as part of works to upgrade the road connections between Motherwell […]
Read more »